Onshore Pipeline Projects

TransCanada Keystone XL Pipeline Project – US Steele City Pipeline

UniversalPegasus is providing survey, detailed engineering, construction management, and inspection services for 850 miles of 36-inch heavy crude pipeline for TransCanada Pipelines LTD, from Montana/Canadian Border near Morgan, Montana to Steele City, Nebraska. This project is scheduled for construction in 2011 and 2012.

Trailbreaker Line 6B Project

UniversalPegasus is providing engineering design, drafting and material procurement services to Enbridge Energy Company for the expansion of seven (7) crude oil pump stations and the addition of seven (7) new pump stations to accommodate a capacity of 425,000 BPD of heavy Canadian crude from Griffith Terminal, IN to Sarnia, Ontario. The project is expected to be completed in 2011.

Florida Gas Phase VIII Project

UniversalPegasus is providing services to Florida Gas Transmission for the portion of their Phase VIII project consisting of 240 miles of 36, 30, and 24-inch pipeline and 10 compressor stations with 15 compressor units from Mississippi to Florida. Services include FERC filling, detailed engineering design and as-built drawings. Projected completion date is scheduled for 2010/2011.

Motiva Hydrogen Pipeline Project

UniversalPegasus is providing engineering design, survey, drafting/mapping, construction inspection and material procurement assistance for Air Liquide to install an 85-mile, 20 -inch pipeline to transport hydrogen from Air Liquide's Bayport plant to Motiva's refinery in Port Arthur, TX. ROW acquisition services and environmental services are being provided by sub-contractors working for UniversalPegasus. Alignment drawings are being prepared in Civil 3D and Land Development with CAD Overlay and expected to finish construction during the first quarter of 2010.

TransCanada Keystone Project

UniversalPegasus is providing detailed engineering, survey, construction management and inspection services for 1,600 miles of 30-inch heavy crude pipeline for TransCanada Pipelines LTD, from the Canada Border to Cushing, Oklahoma with a line to Patoka, Illinois. Project is scheduled for construction through 2010.

TransCanada Keystone XL Gulf Coast Project

UniversalPegasus is providing survey, ROW, detailed engineering, GIS, drafting, construction management and inspection services to TransCanada Pipelines LTD, for 500 miles of 36-inch heavy crude pipeline from Cushing, Oklahoma to the TX Gulf Coast near Beaumont. Included on this project is a 50-mile pipeline from Beaumont to the Houston, Texas market place. This project is scheduled for construction in 2010.

OneOK Arbuckle Phase 2 Project

UniversalPegasus is assisting OneOK NGL Gathering, LLC, in providing project management, survey, detailed design, construction management and inspection services for the 460 miles of 16-inch natural gas liquids pipeline from Velma, Oklahoma to Mont Belvieu, Texas. The project is expected to be completed in 2009.

Sherman Extension Pipeline Project

The Sherman Extension will be comprised of 178 miles of 36-inch diameter pipeline and two (2) electric drive compressor stations, originating at a central delivery point on Enterprise Products Operating, L.P.'s Texas intrastate pipeline system near Morgan Mill, Texas (southwest of Fort Worth) and will extend through the center of the current Barnett Shale development area to Sherman, Texas. From there, it will connect with Boardwalk's 42-inch Gulf Crossing Expansion, which features interconnects with seven major interstate pipelines, including the Transcontinental Pipeline Company system that accesses markets in the Northeast. Services being provided include survey, drafting, GIS, detailed engineering, construction, and as-built. This project is expected to be completed in 2009.

CCPS Spearhead North Reversal and Sale Project

UniversalPegasus is providing engineering design, drafting and material procurement assistance for the addition of one (1) new pump station, modifications of two (2) terminals adding booster pumps, piping, quality control, surge relief system, pressure control, deactivation and nitrogen purging for Enbridge Energy Company to accommodate the transportation of 130,500 BPD of heavy Canadian crude from Flanagan, Illinois to Hartsdale, Indiana on Enbridge's Spearhead Pipeline System. This project is expected to be completed in the first quarter of 2009.

Transwestern Phoenix Lateral Project

UniversalPegasus is providing detailed design of 63 miles of 42-inch pipeline, and construction management, inspection, materials handling and survey services for 270 miles of 42-inch products pipeline in New Mexico and Arizona for Transwestern Pipeline Company. It is expected to be completed in 2009.

CCPS Spearhead South Expansion Project

UniversalPegasus provided engineering design, drafting and material procurement services to Enbridge Energy Company for the expansion of nine (9) crude oil pump stations and the addition of three (3) new pump stations to accommodate an increased from 120,000 BPD to 190,000 BPD of heavy Canadian crude from Flanagan, Illinois to Cushing, Oklahoma on their Spearhead Pipeline system. The project is expected to be completed in the first quarter of 2009.

MinnCan Project

UniversalPegasus provided project management, survey, design engineering, GIS, construction management and inspection services, for 304 miles of 24- inch crude oil pipeline for Minnesota Pipe Line Company (Koch), from the Flint Hills Resources Refinery to Clearbrook, Minnesota. This work was completed in 2008.

Florida Gas Pipeline Phase III, V, VI, VII Project

UniversalPegasus performed survey, detailed engineering design and construction management and inspection for hundreds of miles of natural gas pipeline for Florida Gas Transmission, for Phases 3, 5, 6, 7 and the Florida Gas Turnpike replacement projects. Most recently, UniversalPegasus provided survey, design engineering, construction management and inspection services for 200+ miles of natural gas pipeline for Phase 5 and 6 for various looping sections of the Florida Gas Transmission Pipeline as well as completing Phase 6 and 7 of the Florida Gas Transmission Compressor Stations which included the Turkey Point Compressor Station in Miami, Florida. Additionally UniversalPegasus provided survey, design, mapping and construction management for various Florida Turnpike replacement projects. The completion dates for each project varied through 2007.

42" Rockies Express Pipeline (formerly Entrega) Project

UniversalPegasus provided, engineering design, drafting, material specification, material procurement, bid documents and issue for construction drawings for 192 miles of the 42-inch " Rockies Express Pipeline in Colorado and Wyoming for Kinder Morgan. Pipeline was constructed in two spreads in late 2006 and placed in service in January 2007.

Enbridge DC Pipeline Project

UniversalPegasus provided project controls/administration, survey, right-of-way support, non-environmental permitting support, environmental permitting support, engineering/design, mapping, drafting, material management, construction contract management, startup and commissioning, as-builts and archiving for 270 miles of 36- inch natural gas pipeline from Bethel, Texas to Bridge City, Texas with a 24- inch lateral line from Crockett, Texas Including three (3) major pipeline interconnects and two (2) major compressor stations.

Sunstone Pipeline Project

UniversalPegasus provided feasibility studies, project management, survey, preliminary engineering and pipeline routing/constructability services to Williams Gas Northwest Pipeline for their proposed 600- mile 42- inch natural gas pipeline from Opal Wyoming to Stanfield, Oregon and 2 compressor stations all in support of a FERC filing application.

East Texas to Mississippi Expansion Project

UniversalPegasus provided survey, engineering design, mapping, drafting and project management for approximately 240 miles of 42- inch high pressure natural gas pipeline for Gulf South's East Texas to Mississippi Expansion Project. The pipeline is extended from Keatchie, Louisiana to Harrisville, Mississippi with three compressor stations located in Panola County, Texas, Ouachita Parish, Louisiana and Madison Parish, Louisiana. The project included five (5) meter stations for the measurement of receipt and delivery of natural gas transported.

Gulf Crossing Project

UniversalPegasus provided survey, engineering design, mapping, drafting and project management for 355 miles of 42 inch high pressure natural gas pipeline extended from Sherman, Texas to Tallulah, Louisiana. The project also included two compressor stations in Texas and two compressor stations in Louisiana and five meter stations for the measurement and delivery of gas transported within the new pipeline system.

Regency Gas North Louisiana Enhancement Project

This project was designed to loop approximately 50 miles of existing North Louisiana assets and to construct approximately 80 miles of a 30 inch header to connect multiple interstate and intrastate pipelines to transport north Louisiana production to market, and a 10,000 HP mainline compressor station. UniversalPegasus provided engineering design for the pipelines, multiple meter stations, right-of-way acquisition, environmental permitting, survey, preparation of regulatory filings, mapping, certified plats, procurement, non-environmental permitting, contractor bid evaluation, project management, construction inspection, and construction management.

Alliance Natural Gas Pipeline Project

UniversalPegasus performed route selection, Front End Engineering Design (FEED), FERC filing services, cost estimating, detailed engineering design, drafting, survey, mapping, procurement services, project management and construction inspection, for the 888 - mile United States portion 36- inch Alliance Natural Gas Pipelines Project. UniversalPegasus provided services for both the pipeline and the compressor stations required for the project. Two unique aspects of the project are the transportation of natural gas in a high-pressure dense phase and the use of automatic welding machines for pipeline construction, which was a first for onshore cross-country pipeline construction in the United States.

TransColorado Pipeline Project

UniversalPegasus performed engineering design, drafting, route selection, preliminary and as-built, survey, right-of-way acquisition, material procurement, project management, construction management, inspection and start-up assistance services for the 292-mile, 22-inch natural gas pipeline system, TransColorado Pipeline project, from Colorado to Kansas, for Questar Energy.

Tuscarora Gas Transmission Project

UniversalPegasus Performed engineering design, preliminary and legal surveys, mapping, material procurement and construction, inspection services for the 230-mile, 20-inch natural gas project in Nevada and California. Approximately 150 miles of this work was conducted utilizing GPS technology and equipment without any conventional survey methods. Work also included design of pigging, facilities, measurement and SCADA facilities.

Vector Pipeline Project

UniversalPegasus performed engineering design, drafting, route selection, estimates, FERC application support, field survey, right-of-way acquisition, material procurement, project management, construction management, inspection and start-up assistance services, for the 270- mile, 42-inch natural gas pipeline from Chicago, Illinois to Dawn, Ontario, Canada.

West-East Pipeline Project

UniversalPegasus performed project management, field survey, right-of-way and mapping work for the 223 - mile, 36-inch West-East Pipeline Project in Louisiana and Mississippi for Tennessee Gas Pipeline Company. Survey and mapping work included preliminary alignment, right-of-way requirements, environmental/archaeological provisions and exhibits, and construction planning. Work was coordinated from a field office in Vicksburg, Mississippi.

Channelview to Mont Belvieu Pipeline Project

UniversalPegasus provided project management, engineering, survey, drafting, material procurement, right-of-way procurement assistance, and construction management services for the installation of a new 16- inch LPG pipeline from the Enterprise Products Company Channelview terminal to Mont Belvieu. The project included custody transfer measurement, satellite communications systems, PLC and flow computer programming, and SCADA system design, start up and commissioning.

OXYCHEM Ethylene Pipeline Project

UniversalPegasus provided complete engineering design, drafting, and surveying for OXYCHEM Petrochemicals Pipeline Company's 30- mile, 8-inch ethylene pipeline between Corpus Christi and Ingleside, Texas. Included in UniversalPegasus's scope of work was complete procurement for all materials except the line pipe and end point metering facilities and instrumentation.

Express Pipeline Project

UniversalPegasus performed engineering design, preliminary and as-built survey, material procurement, drafting and construction management services for 515 miles of 24 inch crude oil pipeline project from Montana and Wyoming. The work included technical support for right-of-way acquisition and environmental permitting.

Sun MVPL Conversion Pipeline Project

UniversalPegasus performed engineering design, drafting, and project management, for the construction of 40 miles of 24- inch refined products pipeline, . Cconversion of 173 miles of 30 inch natural gas pipeline to products, service and conversion of 838 miles of 20 inch and 22 inch crude oil pipeline to products service between the Houston Ship Channel and Lima, Ohio. The project included construction of one new pump station, rebuilding of 22 existing pump stations and construction of 3 terminals.

Williams Energy Pipeline Project

UniversalPegasus provided engineering support services, which included surveying, drafting, and hydraulic studies in support of the Environmental Impact Statement for a 250-mile, 12-inch refined products pipeline between Crescent Junction, Utah and Salt Lake City, Utah. UniversalPegasus also provided engineering studies for the reversal of the existing 10-inch pipeline between Crescent Junction, Utah and Bloomfield, New Mexico.

Mid-Continent Express – MCX Project

UniversalPegasus provided CenterPoint/Duke Energy project management, survey, preliminary engineering and pipeline routing/constructability review for the 1600 miles of 42- inch natural gas pipeline from Pampa, Texas to Baron, Alabama all in support of a FERC filing application for CenterPoint/Duke Energy.

Delhi Project

UniversalPegasus provided the detailed engineering design for the expansion of Denbury Onshore, LLC's existing CO2 pipeline. The expansion involved the installation of approximately 80 miles of 24- inch and 16- inch pipelines, including a 6,100 foot HDD crossing of the Mississippi River and a meter station near Dunn, Louisiana. UniversalPegasus coordinated the third party surveying, environmental permitting, and right-of-way acquisition services and provided material procurement support.

Return to World-Class Project Experience >